12.5 C
Jammu
Monday, November 18, 2024
HomeChief Secretary reviews Wullar Lake Conservation Project
Array

Chief Secretary reviews Wullar Lake Conservation Project

Date:

Related stories

Prez Droupadi Murmu to visit Siachen Base Camp tomorrow, interact with troops

Sunil Kumar Leh: President Droupadi Murmu will visit the Siachen...

CEC Gyalson launches Mahindra Thar ROXX MX5 in Leh

Leh, Sept 20: In a significant push for local...

Mega Camp held in village Tangole as part of Rashtriya Poshan Maah Campaign

Kargil, Sept 20: In a significant push towards improving...
spot_imgspot_img

41EARTH NEWS SERVICE  Jammu, Dec 16 |15: Chief Secretary B R Sharma Wednesday underlined the importance of Wullar Lake in protecting Kashmir Valley from floods by acting as a huge water storage reservoir. He said the de-silting effort launched under the comprehensive Wullar conservation and management plan needs greater impetus to increase the water holding capacity of the Lake. Chairing a review meeting of the Wullar Conservation & Management Authority (WUCMA) here, Chief Secretary said that the ongoing conservation and protection measures for eco-restoration of Wullar Lake and its feeder channels, associated wetlands and marshes should gain momentum in view of the massive floods that struck the valley in September- 2014. He said Wullar Lake provides a natural way out for the excess or flood waters in Jhelum and it needs to be protected and conserved at all cost. Under the 13th FC, Rs 120 cr were sanctioned for taking up conservation and protection measures in Wullar Lake, out of which Rs 60 cr were allotted. Till date, Rs 37.5 cr have been utilised for survey & demarcation, catchment conservation and water management of Wullar Lake. While reviewing the progress of the project, Chief Secretary was informed that entire periphery of the lake has been demarcated as per authentic revenue record which indicates a lake area of 130 sq kms. As many as 1159 geotagged boundary pillars have been erected delineating the lake boundary from adjoining areas. Besides this, till date 9.11 lakh cum of silt has been dredged out from the lake along with removing over 26000 willow trees. Measures to arrest soil erosion in the catchment area have been taken by erecting check dams and protection banks and planting over 3 lakh conifers in the adjoining forest area. Chief Secretary also discussed future funding requirements of the project with directions to the Forest department to submit a proposal that would ensure uninterrupted funding to accomplish the remaining operations for conservation of Wullar Lake as per the DPR.

Share this

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from up to 5 devices at once

Latest stories

spot_img

LEAVE A REPLY

Please enter your comment!
Please enter your name here