15.3 C
Jammu
Sunday, November 17, 2024
HomeLadakhGovt relieves three Engineers from Ladakh; orders transfers, postings of 9

Govt relieves three Engineers from Ladakh; orders transfers, postings of 9

Date:

Related stories

Prez Droupadi Murmu to visit Siachen Base Camp tomorrow, interact with troops

Sunil Kumar Leh: President Droupadi Murmu will visit the Siachen...

CEC Gyalson launches Mahindra Thar ROXX MX5 in Leh

Leh, Sept 20: In a significant push for local...

Mega Camp held in village Tangole as part of Rashtriya Poshan Maah Campaign

Kargil, Sept 20: In a significant push towards improving...
spot_imgspot_img

LEH: The union territory of Ladakh in pursuance of Orders under reference, the following Engineers who are repatriated from the Union territory are hereby relieved of from their respective places of postings in the UT, with immediate effect, with the direction to report to the General Administration Department, UT of J&K.

According to the order, Feroz Ali Mir, I/c Assistant Engineer, PDC, Kargil; Sunny Kumar, Junior Engineer, Igoo-Phey, Division, Leh and Mudasir Ahmad Wani, Junior Engineer, PHE, Division, Kargil are relieved of from their respective places of postings in the UT.

Consequent upon the above and in the interest of administration, the administration ordered transfers and postings of Engineers with immediate effect, until further orders.

Phurbu Sandup, I/c Assistant Executive Engineer, Hydraulic Division, Zanskar is transferred and posted in PHE, Division, Leh (SD, Khaltsi).

Iqbal Hussain Akhoon, I/c Assistant Executive Engineer, Chief Engineer Office, Htqr. at Kargil is transferred and posted in Hydraulic Division, Zanskar.

Mumjaz Hussain, I/c Assistant Executive Engineer, PHE Division, Leh (SD Khaltsi) is transferred and posted in Chief Engineer Office, Htqr. at Kargil.

Basit Mohi-ud-Din Dar, Assistant Engineer, awaiting orders of adjustment, is posted in PHE, Division, Leh (SD Kharu).

Toyoeb Hussain, I/c Assistant Engineer, I&FC, Division, Leh is transferred and posted in Hydraulic Division, Zanskar.

Fatima Khatoon, I/c Assistant Engineer, PHE, Division, Leh (SD Kharu) is transferred and posted in I&FC Division, Leh.

Imran Rahi, Junior Engineer, awaiting orders of adjustment, is placed at the disposal of CEO, LAHDC, Leh as replacement to Sh. Sunny Kumar, JE, who is relived of from Igoo-Phey Division, Leh.

Mohd Younis Shah, Junior Engineer, awaiting orders of adjustment, is placed at the disposal of CEO, LAHDC, Kargil as replacement to Sh.Mudasir Ahmad Wani, JE, who is relieved of from PHE, Division, Kargil.

Amir Masood, Junior Engineer, awaiting orders of adjustment, is placed at the disposal of CEO, LAHDC, Kargil as replacement to Sheikh Mohd Aslam, who had been relieved from PHE, Division, Kargil vide Order No.104-LA(GAD) of 2023 dated: -13.04.2023.

The above Engineers shall be deemed to have been relieved of from their respective places of postings with immediate effect.

However, Engineers at S. No. 4, 5 & 6 shall join at their respective places of posting after retirement of Rehmatullah Wani, I/c AE on 30.06.2023. The AE at S.No.4 in the meantime shall remain attached in the Administrative Department.

Share this

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from up to 5 devices at once

Latest stories

spot_img

LEAVE A REPLY

Please enter your comment!
Please enter your name here