26 C
Jammu
Saturday, November 16, 2024
HomeNorth IndiaJammu & KashmirConstruction of run way by IAF no new project, not linked with...

Construction of run way by IAF no new project, not linked with any stand-off: Div Com Kashmir

Date:

Related stories

Prez Droupadi Murmu to visit Siachen Base Camp tomorrow, interact with troops

Sunil Kumar Leh: President Droupadi Murmu will visit the Siachen...

CEC Gyalson launches Mahindra Thar ROXX MX5 in Leh

Leh, Sept 20: In a significant push for local...

Mega Camp held in village Tangole as part of Rashtriya Poshan Maah Campaign

Kargil, Sept 20: In a significant push towards improving...
spot_imgspot_img

 

Srinagar, June 04 : Divisional Commissioner Kashmir P K Pole Thursday said that the work on the three-kilometre run way on Srinagar-Jammu national highway in Bijbehera area of South Kashmir’s Anantnag by the Indian Air Force (IAF) is not a new project and rather an old project that got stalled due to the winter.

“There is no connection of work on three-kilometre runway in South Kashmir by the IAF with Indo-China standoff. This has no link with any other issue. It was an old project on which work was suspended due to the winter,” Pole told.

Amid the India-China stand-off in Ladakh, the Indian Air Force (IAF) has started construction of a 3-kilometer long runway along the Srinagar-Jammu National Highway (NH-44) in Bijbehara area of district Anantnag.

The construction work started on Monday and is going on fast pace. “The runway is being constructed by the Air Force,” Major General, A Sengupta, General Officer Commanding (GOC), Awantipora-based Victor Force had stated while addressing a press conference. Sources told KNO that emergency landing and runway strip was under construction—(With KNO Inputs)

Share this

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from up to 5 devices at once

Latest stories

spot_img

LEAVE A REPLY

Please enter your comment!
Please enter your name here